Project Tulip

Quality Independent Homes

Weekend Villas

Current Status

Completed

Location

Tikonia Link Rd Heera Nagar Uttarakhand 263139

RERA NO.

Not Applicable

Overview

At Tulip, Quality Independent Homes.

Krishna Murari Group headed by Mr Sanjeev Sharma has a diversified portfolio which includes petroleum,transportation,army supply,renewable energy,commercial and housing projects.
Krishna Murari Infratech Private Limited is a subsidiary company of Krishna Murari group.The company has completed many successful projects in Rudrapur and Haldwani.It has ongoing projects in Nainital and Nakuchiatal.

Krishna Murari Infratech is credited with transforming Haldwani by introducing the concept of 'luxurious affordable villas'.The tag line 'PLOT KI KEEMAT PAR GHAR' is our punch line which explains everything-our mission and vision.We seek to give you comfortable and luxurious homes without putting pressure on your pockets.
After the huge success of our residential project'Umang' Krishna Murari Infratech decided to launch another massive project of 150 Villas in Haldwani.It is located admist lush greenery in a strategic location; nearby to all major industrial and business cities of Kumaon. Visit Us

Amenities

30 Feet Wide Road

Uninterrupted Water Supply With Own Tubewell

Solar Street Light to Promote Green Environment.

Children’s Park

High Class Construction With Modular Kitchen & SS Fittings.

Car Parking in Every home

Vastu Complaint.

Strategic Location

Specification

Structure
  • Living Room, Dining Room Lounge
  • Floors
  • External Doors and Windows
  • Walls Internal
  • External
  • R.C.C Framed Structure
  • Tiles/Laminated Floor /Mosaic
  • Oil Bound Distemper
  • Enamel Painted Flush Doors
Bedrooms & Dress
  • Floors
  • External Doors and Windows
  • Walls Internal
  • External
  • Internal Doors
  • Tiles/Laminated Floor /Mosaic
  • Window: Wooden Frame With Wooden Shutters
  • Doors: Flush Doors, Oil Bound Distemper
  • Good Quality External Grade Paint
  • Enamel Painted Flush Doors
Modular Kitchen
  • Floor Vitrified Tiles
  • External Doors and Windows
  • Fixture and Fitting
  • Walls
  • Vitrified Tiles
  • Window: Wooden Frame with Wooden Shutters
  • MODULAR KITCHEN FITTINGS, STONE TOP WITH SINK CERAMIC TILES 2’-6” ABOVE COUNTER, BALANCE
  • WALLS PAINTED IN OIL BOUND DISTEMPER
  • Doors: Flush Doors
Balconies / Verandah
  • Floors
  • Railings
  • Ceramic/Vitrified Mosaic Tiles
  • MS Railing As Per Design
Staircase / Lobbies /
Corridors
  • Floors
  • Walls
  • Ceramic/Mosaic Tiles/Marble/Kota
  • Equivalent, Oil Bound Distemper
Toilets & Dress
  • Floors
  • External Doors and Windows
  • Fixture and Fitting
  • Walls
  • Internal Doors
  • Virtified Tiles, Ventilator: Wooden Frame With Wooden Shutters
  • Doors: Flush Doors
  • All Provided Of Standard Company Make, Tiles in Cladding Up to 7’ Height
  • Remaining Wall Painted in Oil Bound Distemper
  • Equivalent, Oil Bound Distemper

Floor Plans

Ground Floor Plan

2 BHK Affordable Luxury Homes

Ground Floor Plan

3 BHK Affordable Luxury Homes

First Floor Plan

4 BHK Affordable Luxury Homes

Ground Floor Plan

2 BHK Affordable Luxury Homes

Ground Floor Plan

3 BHK Affordable Luxury Homes

First Floor Plan

4 BHK Affordable Luxury Homes

Locatio Map of Tulip

Siteplan

Payment Plan

S. No. Category Type Unit Plot Area Super Area Plot Size
1 Tulip 1 Dublex 3 BHK 720 Sqft 1150 Sqft 20 X 36
1 Tulip 1 Dublex 3 BHK 960 Sqft 1600 Sqft 20 X 48
1 Tulip 1 Dublex 3 BHK 1225 Sqft 2100 Sqft 20 X 49
Down Payment Plan ( 5% Discount)
At The Time of Booking 20%
Within One Month of Booking 75%
At The Time of Possession 5%
Construction Linked Plan
At the time of booking 10%
Within one month of booking 15%
At Plinth Level (50% of PLC applicable) 10%
At Competition Of Ground Floor Lintel Level (Door Band) 10%
At Slab Casting Of Ground Floor (50% of PLC applicable) 10%
At Slab Casting Of First Floor 10%
On Competition Of Plastering 10%
On Flooring Work 10%
On Finishing Work 10%
At The Time Of Possession 5%
PLC
Two Side Open & Main Road Facing Rs 125 Sqft
Terms and Conditions
Booking will be accepted on Company's application form with detailed terms and conditions.
Cheque/Draft to be made in favour of "KRISHNA MURARI INFRATECH PVT LTD" Payable at Haldwani.
Time duration of complication of project OR hand over is approx 14 -18 months.
P.L.C charges would be extra as per location.
Electricity and Water connection charges will be charged extra as per as Govt. norms.
Management reserve right to amend / change the price list.